At about 10:48 hrs on Friday 25 January 2008, the tenth wagon of freight train 6M49 - the 09:02 hrs service from Immingham Docks to Rugeley Power Station - derailed on a plain line at Santon, between Wrawby Junction and Foreign Ore Branch Junction, Scunthorpe. The front four wheels of the wagon, which was loaded with coal, left the rails, and the train continued for just over a mile before stopping. No one was injured in this derailment, but there was considerable damage to the railway infrastructure and the line was subsequently closed for over a week while repairs were carried out.

The RAIB investigation identified that the immediate cause of the accident was that the front right-hand wheel of the wagon rode over the rail as the train traversed a left hand curve at Santon. This was because the load on this wheel was significantly reduced by the combined effect of a number of track geometry faults close to each other. The local Network Rail inspection and maintenance regime had not detected that these faults, which had been addressed by maintenance action three months prior to the derailment, had re-occurred.

The track geometry was deteriorating rapidly because of considerable amounts of water running in the formation beneath it. No-one reported or responded to the signs of water and poor drainage around the point of derailment. The load on the first wheel to derail was also reduced by coal being unevenly loaded in the wagon.

As a consequence of this accident, the RAIB has made eight recommendations targeted at the infrastructure owner Network Rail relating to track inspection and maintenance standards, track drainage at Santon, the identification of the exact location of rapid track deterioration, the monitoring of track repair quality and guidance about action to take if water affects the track.

One further recommendation to address the uneven loading of the wagon is targeted at Freightliner Group Limited.

Download report:
PDF icon 090430_R102009_ForeignOre.pdf (2,932.82 kb)

Download Adobe PDF reader software free from the Adobe Reader website.

Note: Users of Adobe PDF Reader version 5 (and below) may experience problems opening these PDF reports. We recommend that you upgrade to the latest version of Adobe PDF Reader by following the link above.