Investigation into a collision between a train and a lorry at Llanboidy level crossing, near Whitland, Carmarthenshire on 19 December 2011
The RAIB’s preliminary examination has found that the lorry, which was carrying straw bales and towing a similarly loaded trailer, had stopped on the level crossing, with the crossing barrier on the exit side lowered in front of it. The train, a two coach diesel multiple unit, had been approaching the crossing at about 68 mph (109 km/h), but an emergency brake application had reduced the speed to about 41 mph (66 km/h) when the collision occurred. The train pushed the lorry about 80 metres along the railway.

Collision at Llanboidy level crossing
The investigation will identify the exact sequence of events that led to the accident. It will also include consideration of the layout of the level crossing, the actions of the lorry driver, the factors which caused the lorry to stop on the crossing and the crashworthiness of the Class 175 unit involved in the collision.
The RAIB's investigation is independent of any investigation by the police or safety authority (the Office of Rail Regulation).
The RAIB will report on its findings, including any recommendations to improve safety, at the conclusion of its investigation. This information will be available on the RAIB website.
You can subscribe to automated emails notifying you when the RAIB publishes its reports. Click to subscribe.